Deprecated: iconv_set_encoding(): Use of iconv.internal_encoding is deprecated in /home/swdakota/public_html/libraries/joomla/string/string.php on line 28

Deprecated: iconv_set_encoding(): Use of iconv.input_encoding is deprecated in /home/swdakota/public_html/libraries/joomla/string/string.php on line 29

Deprecated: iconv_set_encoding(): Use of iconv.output_encoding is deprecated in /home/swdakota/public_html/libraries/joomla/string/string.php on line 30
IHS Replace HVAC System Phase III
image
IHS Replace HVAC System Phase III
Sells, AZ

This project is located at the Sells Indian Health Service Hospital located on the Tohono O'Odham Indian Reservation, Sells, AZ, approximately 60 miles southwest of Tucson, AZ. The hospital is a 34-bed health care facility which operates 24 hours-a-day, seven-days-a-week. The building will be occupied during work. The major equipment items that are required by this project are two new chillers, two new boilers, and a new generator. The project will remove a cooling tower, boiler and absorber. Demolition of existing plumbing, ductwork, and electrical will be required as part of this project. In conjunction with the demolition is some asbestos abatement of pipe insulation. The placement of new ductwork, piping, and electrical will be required to make this project fully functional as drawn in the plans.